You have no items in your shopping cart.
WiTi Anti-Theft System | Advanced Security & Immobilisation for Caravans, Motorhomes & Trailers
- Locks trailer brakes instantly on unauthorised hitch attempt
- 105dB horn + all external lights flash as deterrent
- 6-Axis Gyroscope detects movement, towing and break-in
WiTi Anti-Theft System | Advanced Security & Immobilisation for Caravans, Motorhomes & Trailers
Australia’s Most Advanced Anti-Theft System for Caravans, Motorhomes, and Trailers
SKU 480 — Compatible with the WiTi Breakaway Switch, SafeTrack GPS and SafeTow Wireless Brake Controller.
The WiTi Anti-Theft System is a state-of-the-art security solution designed specifically to protect caravans, motorhomes, and trailers from theft. It features intelligent movement detection using a sensitive gyroscope that detects any unauthorised motion. For intrusion protection, it includes a wireless PIR motion sensor and a magnetic door switch to detect break-ins.
If movement or intrusion is detected, the system triggers a loud 105dB alarm and flashes the vehicle’s lights to deter thieves. In addition, WiTi's unique brake locking function activates if an attempt is made to tow the vehicle, locking the electric brakes and immediately immobilising the caravan or trailer.
The system integrates directly with your vehicle’s lighting and braking circuits, delivering seamless, round-the-clock protection. It supports pairing with up to 20 additional PIR sensors and door switches for expanded coverage.
Package includes:
-
1 x WiTi Anti-Theft System
-
2 x Remote Controls
-
1 x Wireless PIR Motion Sensor
-
1 x Wireless Magnetic Door Switch
-
1 x External Status LED
-
1 x Horn
-
1 x Wiring Loom
Note: WiTi Anti-Theft cannot be connected to motorhome braking systems.
-
1 x WiTi Anti-Theft System
-
2 x Remote Controls
-
1 x Wireless PIR Motion Sensor
-
1 x Wireless Magnetic Door Switch
-
1 x External Status LED
-
1 x Horn
-
1 x Wiring Loom
- Genuine, Quality-Checked PartsEvery product we list is sourced from trusted brands and checked for fit and durability.
- Fast DispatchMost orders ship within 1-2 business days from our warehouse.
- Expert SupportNot sure what fits your setup? Our team can help before you buy.
- Warranty BackedProducts are covered by manufacturer warranty for peace of mind.
